6)Freeze Cycle – BCH, GM, FM, CR, and Comp energize. NOTICE! Some units contain a sticker that states: "The bin control heater has been disconnected. DO NOT reconnect the bin control heater." In this case, leave BCH disconnected or replace BC assembly with 3A2561A03. Ice production starts 4 to 6 minutes after Comp energizes depending on ambient and water conditions. Refill: The float-operated

WV allows water into the reservoir as needed to continue the icemaking process. If the water supply is cut off or GM stops during the freeze cycle, the cold evaporator temperature causes STS to open and de‑energize all components except BCH and optional drain pump HS-0248.

Diagnosis: Check that GM, FM, and Comp energize. If not, check the power switch, STS, BC assembly, GM external protector, GM windings (check when GM is cool), GM capacitor, voltage to FM, FM windings, fan blade binding, voltage on CR, PTC relay, voltage on Comp external protector, Comp terminals, and Comp windings. If optional drain pump HS0248 is installed, see "IV.E. Optional Drain Pump HS-0248." If GM starts, but the auger does not turn, check the spline coupling between the auger and GM.

7)Shutdown (bin full) – Ice fills storage bin to level of BC. BC opens within 10 seconds after ice contact. BCH remains energized. GM, FM, CR, and Comp de‑energize. Diagnosis: When the icemaker is running, hold ice in contact with BC bulb. If the components fail to deenergize within 10 seconds, check BC. See "IV.C. Bin Control Check."

Legend: BC–bin control thermostat; Comp–compressor; CR–compressor relay; FM–fan motor; GM–gear motor; STS–suction temperature safety (low water/freeze‑up safety)