Hotpoint EG74 manual Operational Checks, Installation

Models: EG74

1 32
Download 32 pages 37.54 Kb
Page 29
Image 29
OPERATIONAL CHECKS

Installation

OPERATIONAL CHECKS

After installation, check for gas soundness. The supply pressure can be checked at one of the hotplate burner injectors.

Check that the hotplate burners ignite correctly and burn with a steady flame. Check for a steady flame at the low setting.

Instruct the user on operation of the cooker.

29

Page 29
Image 29
Hotpoint EG74 manual Operational Checks, Installation