![](/images/backgrounds/285490/hp-mhp-tn-users-manual-55033727x1.png)
8.2 Sectional drawings part list
ITEM | DESIGNATION |
|
|
1110 | Pump casing |
|
|
1221 | Casing cover with stuffing box |
|
|
1500 | Wear ring |
|
|
2110 | Pump shaft |
|
|
2250 | Radial flow impeller |
|
|
2450 | Shaft sleeve |
|
|
2540 | Thrower |
|
|
2905 | Plain washer |
|
|
2912 | |
|
|
3011 | Radial ball bearing |
|
|
3134 | Support foot |
|
|
3200 | Bearing housing |
|
|
3260 | Bearing cover |
|
|
3300 | Bearing bush |
|
|
4120 | Gland |
|
|
4130 | Gland packing |
|
|
4132 | Stuffing box neck bush |
|
|
Gasket | |
|
|
Gasket | |
|
|
Special ring | |
|
|
6511 | Priming plug |
|
|
6515 | Drain plug |
|
|
6544 | Bore circlip |
|
|
6569 | Screwed plug |
|
|
6572 | Stud |
|
|
Hexagon bolt | |
|
|
Hexagon bolt | |
|
|
Hexagon bolt | |
|
|
6581 | Hexagon nut |
|
|
Key | |
|
|
Key | |
|
|
9331 | Cover plate |
|
|
8.3 General arrangement drawing
The typical general arrangement drawing and any specific drawings required by the contract will be sent to the Purchaser separately unless the contract specifically calls for these to be included into the User Instructions. If required, copies of other drawings sent separately to the Purchaser should be obtained from the Purchaser and retained with these User Instructions.
9 CERTIFICATION
Certificates determined from the Contract requirements are provided with these instructions where applicable. Examples are certificates for CE marking, ATEX marking etc. If required, copies of other certificates sent separately to the Purchaser should be obtained from the Purchaser for retention with these User Instructions.
10 OTHER RELEVANT DOCUMENTATION AND MANUALS
10.1 Supplementary User Instructions
Supplementary instructions such as for a driver, instrumentation, controller, seals, sealant system etc are provided as separate documents in their original format. If further copies of these are required they should be obtained from the supplier for retention with these User Instructions.
10.2 Change notes
If any changes, agreed with Flowserve, are made to the product after its supply, a record of the details should be maintained with these User Instructions.
10.3 Additional sources of information
Reference 1:
NPSH for Rotor dynamic Pumps: a reference guide, Euro pump Guide No. 1, Euro pump & World Pumps, Elsevier Science, United Kingdom, 1999.
Reference 2:
Pumping Manual, 9th edition, T.C. Dickenson,
Elsevier Advanced Technology, United Kingdom, 1995.
Reference 3:
Pump Handbook, 2nd edition, Igor J. Karassik et al,
Reference 4:
ANSI/HI
Reference 5:
ANSI B31.3 - Process Piping.
Page 27 of 28 | flowserve.com |