Hardware Installation and Configuration
Hardware Installation and Configuration
This chapter covers the following topics:
•“Install the X506 Chassis” on page 35
•“Connect the Power” on page 36
•“Complete Initial Setup Configuration” on page 36
•“Connect the X506 Device to the Internet” on page 37
•“Register the 3Com X506 Device” on page 37
Install the X506 Chassis
To install the TippingPoint follow the steps in these sections:
Determine Total Rack Space
Before you install the chassis, you must determine the total rack space that is required. The required rack space increases if you plan to install multiple systems.
The X506 device fits in either a
Table 4 - 6: Rack Space Requirements
Requirement | Configuration | Min/Max Number of Chassis | |
Type | |||
|
| ||
|
|
| |
|
|
| |
Physical Size of Rack: | Typical | Maximum of 9 chassis on a | |
Total number of chassis < or = 42 RUs |
|
| |
Each X506 requires 1RU |
|
| |
|
|
| |
Network Equipment Building Systems (NEBS): | Typical | 13 chassis generating < or = 105 Watts | |
Total number of chassis must generate: |
|
| |
< or = 1372 Watts |
|
| |
|
|
|
Bolt the Device to the Rack
Use the following guidelines when you bolt the X506 to the rack:
WARNING: To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to ensure that the system remains stable.
X Family Hardware Installation Guide V 2.5.1 | 35 |
|
|