22.Insert bolt (47) through left side upper elevator tube (43), then stretch spring (41) onto bolt (47). Insert bolt (47) through right side upper elevator tube (43) and secure with nut (39).
43
47
41
43
WARNING! |
USE EYE PROTECTION |
WHEN INSTALLING |
SPRINGS. |
39
43
23.Roll completed assembly to desired position. Secure assembly to ground using anchor strap (52) and tie down stake (53). Fill tank with water (approx. 30 gallons /115 Liters) or sand (approx. 255 lbs./113 kg) and snap cap (49) in place.
49
52
53
WARNING! |
DO NOT LEAVE |
ASSEMBLY UNATTENDED |
WHEN EMPTY; IT MAY TIP |
OVER. |
CAUTION!
ADD TWO GALLONS (7.6
LITERS) OF
ANTIFREEZE IN SUB-
FREEZING CLIMATES.
19 | 08/05 | P/N 21495407 |