ASSEMBLY

ASSEMBLY

1INSTALLING DRIVE PULLEY

1.Remove the discharge chute from the deck. (Deck configuration will vary by size and model)

2.Lower deck to the lowest cutting position.

3.Remove the right hand (discharge side) belt cover from the deck.

4.Relieve the tension from the deck belt and remove from the center deck pulley.

(See Operator’s Manual if necessary)

Deck Height

1INSTALLING DRIVE PULLEY Adjustment

Belt Cover

Discharge Chute

5.Remove the nut securing the right hand deck pulley to the spindle.

6.Install drive pulley included in collection system kit on top of the current deck pulley.

7.Reinstall the nut on the spindle and torque to 55- 75 ft/lbs.

8. Reinstall the deck belt.

Drive Pulley

2MOUNTING BLOWER ASSEMBLY

1.Position blower over the discharge tabs on the deck and set blower onto the deck.

2.Be sure the blower is sitting flush against the outside of the deck.

Rear Mount Bracket

Contact Area

3.Install the front mount bracket to the deck with the pin and hairpin cotter supplied with the kit.

Hairpin Cotter

Outer Pulley Cover

Pin

8

Page 7
Image 7
Husqvarna 2009-01, 966004501 manual Assembly, 1INSTALLING DRIVE PULLEY, 2MOUNTING BLOWER ASSEMBLY