8
1. Removethedischargechutefromthedeck.(Deck
congurationwillvarybysizeandmodel)
2. Lowerdecktothelowestcuttingposition.
3. Removetherighthand(dischargeside)beltcover
fromthedeck.
4. Relievethetensionfromthedeckbeltandremove
fromthecenterdeckpulley.
(SeeOperator’sManualifnecessary)
ASSEMBLY
1INSTALLING DRIVE PULLEY
5. Removethenutsecuringtherighthanddeck
pulley to the spindle.
6. Installdrivepulleyincludedincollectionsystemkit
ontopofthecurrentdeckpulley.
7. Reinstall the nut on the spindle and torque to 55-
75 ft/lbs.
8. Reinstallthedeckbelt.
DeckHeight
Adjustment
Belt Cover
Discharge Chute
Drive Pulley
1. Place blower assembly on secure table or stable
surface.
2. Remove the bolts securing the rear mount
bracket.
3. Usingthehacksaw,trimtheblowerhousingalong
the recessed grooves.
4. Reinstalltherearmountbracketwithpreviously
removed bolts.
2TRIMMING BLOWER
MountBracketRear
Tension Release Lever
Trim Line