Husqvarna C342B owner manual CHUTE LATCH ASSEMBLY See Fig Use Hardware - - GROUP F & G, Assembly

Models: C342B

1 19
Download 19 pages 20.75 Kb
Page 11
Image 11
8 CHUTE LATCH ASSEMBLY

ASSEMBLY

8 CHUTE LATCH ASSEMBLY

(See Fig. 8)

Use Hardware - - GROUP "F & G"

1.Assemble hardware shown (latch pin) to upper chute.

2.Press weld nut into rubber latch and assemble rubber latch to lower chute, as shown.

3.Tighten all hardware securely.

9

UPPER CHUTE (See Figs. 9A & 9B)

No hardware required

 

1.Lower mower deck to its lowest cutting position.

2.Assemble upper chute by inserting curved end into hole in back of cover.

NOTE: Handle carefully so as not to damage dump bag indicator.

#10 X 1-1/8" SCREW

UPPER CHUTE

WASHERS

3/16 X 3/4 X 16 GA.

SPLIT

SPACER

ACORN NUT

3.Push in and turn upper chute until it is in line with lower chute.

4.Align the bosses on lower chute with alignment slots on upper chute and slide together.

5.Secure with rubber latch by hooking hole in latch over latch pin.

DUMP BAG

UPPER INDICATOR HANDLE

CHUTE

#10 X 5/8"

SCREW

LOWER CHUTE

WASHER

RUBBER LATCH

WELD

NUT

COVER

LOWER

CHUTE

3/16 X 3/4 X 16 GA.

LOCK WASHER

FIG. 8

FIG. 9A

ALIGNMENT

SLOT

LATCH PIN

RUBBER

LATCH

BOSSES

FIG. 9B

10 LEVEL MOWER DECK No hardware required

Be sure deck is properly leveled for best mower perfor- mance. See your tractors owner's manual for instructions.

11

Page 11
Image 11
Husqvarna C342B CHUTE LATCH ASSEMBLY See Fig Use Hardware - - GROUP F & G, UPPER CHUTE See Figs. 9A & 9B, Assembly