ASSEMBLY

6BAGGER MOUNT

1.Using 1¾" round head shoulder bolts and nuts, attach the mount hitch to the mount tube as illustrated. Make sure the elbowed arm of the tube is on the right side, with the mount hitch installed to the front.

2.Attach the support bracket to the tube assembly with two 1¾" round head shoulder bolts and nuts.

3.With a 1" hex bolt and nut, secure the lower mount hitch to the frame.

FRONT

Spacer Plate

Support Bracket

Mount Tube

Lower Mount Hitch

4.Install the mount straps (bends are to the inside) on the outside of the mount tube using 2" hex bolts and nuts. The front side of the mount straps are secured to the fuel tank brackets with 1" round head shoulder bolts and nuts.

5.To prevent contact of the left hand strap with the EFM (Electronic Fuel Management) box on the engine, place the foam strip on the inside of the strap, next to the box. (Illustration location is approximate.)

6.It may necessary to drill holes into the rear guard to accept the hardware for the support bracket and spacer plate. Using the bracket as a template, drill 5/16" holes.

7.Slip the spacer plate between the support bracket and the rear guard and attach both to the rear guard with ¾" hex bolts and nuts as illustrated.

8.Tighten all hardware.

Foam Strip

Mount Straps

Support Bracket and

Spacer Plate

7

Page 7
Image 7
Husqvarna M-ZT 61 /966793003, M-ZT 52 /966793002 manual 6BAGGER Mount