Rev.0303
Finishing Touches
JOINT TRIM
After cases have been leveled and joined,and refrigeration, electrical, and waste piping work completed, install the splashguards. Fasten along the top edge, or center, with #10 X 3/3" sheet metal screws.
Joint Trim
Joint Trim
ASCS
Butyl Locations
DO NOT SEAL JOINT TRIM TO FLOOR!
BUMPER INSTALLATION TIPS
1.Start to attach the bumper at one end of the lineup, preferably on a straight case.
2.Push the end of the bumper into the bumper channel firmly.This may be difficult if bumper is cold.
3.Bend the bumper backwards to open and guide it forward onto the bumper channel.
4.An inside bumper miter must be cut on wedges.
5.Loose ends on miters must be anchored with screws on the bottom edge.
6.The top and bottom edges of the bumper must be firmly seated into the retainer by applying with a rubber mallet (not by hand).
7.The bumper should be struck by the mallet at a slight angle that forces the bumper back into itself to prevent stretching.The installation can be made easier by applying a paraffin block to the retainer grooves.
INSTALLING SPLASHGUARD
After merchandisers have been leveled and joined, and all drip piping, electrical and refrigeration work has been completed, install the splashguards. Splashguards may be sealed to the floor using a vinyl cove base trim.The size of trim needed will depend on how much the floor is out of level. NOTE:The splashguard must be removable to allow access to components behind it.
1.Remove all dirt, wax, debris, etc. from the area of the splashguard to ensure a secure adhesion.
2.Apply a good contact cement to the trim, allowing a proper dry time.
3.Install trim to the splashguard so that it is flush with the floor.
13