
Step 4. Apply Power to the Switch
The maximum current requirements are 10 amps at 100 VAC or 4.2 amps at 240 VAC.
❑Attach the AC power cords to the Power Supply blades and wall outlets or power strips. Secure the strain relief bales to the plugs. Place the On/Off switches in the On position.
❑The switch runs its self tests and begins normal operation – this may take a few minutes. Observe the Maintenance Panel and verify that the CPU0 blade Heartbeat LED is blinking about once per second and the Chassis Fault LED is NOT illuminated.
CHASSIS |
| CHASSIS |
GOOD LED |
| FAULT LED |
CPU0
HEARTBEAT
LED
Step 5. Verify Workstation Requirements
❑Verify that your workstation can support the Enterprise Fabric Suite 2007™ application with the following minimum requirements:
Windows® 2003 SP1/SP2/R2 and XP
256 MB memory minimum; 512 MB recommended
150 MB disk space
1 GHz processor
Video card with 256 colors
CD ROM drive,
Internet Browser: Microsoft® Internet Explorer® 5.0, Netscape Navigator® 6.0, Firefox® 1.0, or Mozilla™ 1.5
Java® 2 Standard Edition Runtime Environment 1.4.2
❑The default IP address of a new switch is 10.0.0.1. Ensure that your workstation is configured to communicate with the 10.0.0 subnet.
4