Step 6. Connect the Workstation to the Switch

Connect the CPU0 blade Ethernet port directly to the workstation using an Ethernet cable, or indirectly through a switch or hub. The Ethernet port automatically discovers straight and cross-over cables. You must have a live Ethernet connection when the workstation powers up.

NOTE: The Maintenance Panel Ethernet ports on the front of the switch are disabled and should not be used for the initial installation. You can enable the Maintenance Panel Ethernet ports after the switch is operational.

CPU0 BLADE

ETHERNET PORT

Step 7. Install Enterprise Fabric Suite 2007

The Enterprise Fabric Suite 2007 application includes the Configuration Wizard. This wizard auto-detects and configures the switch based on selected options and recommended settings. To install the Enterprise Fabric Suite 2007 application on a Windows workstation/server, perform the following steps:t

1.Insert the Enterprise Fabric Suite 2007 disk into the CDROM drive.

2.Select the Enterprise Fabric Suite 2007 tab at the top of the screen.

3.Click Agree in response to the End User License Agreement.

4.Select Install for Windows 2003, XP.

5.Double click the Windows_6.08.xx.exe file to begin installation.

6.Enter the serial number and license key provided to activate the Enterprise Fabric Suite 2007 application.

If the product introduction screen does not open, open the CD with Windows Explorer and run the installation program with the following path:

Switch_Manager\Windows_6.08.xx.exe

Step 8. Obtain Network Configuration

Obtain the IP address and subnet mask from your network administrator. Be sure that your workstation is configured for the same subnet.