32 Hardware Management Console (HMC) Case Configuration Study for LPAR Management
6. Repeat steps 1 through 5 for creating the reverse operation, specifying julia
the target partition for the scheduled operation, and 06:00:00 AM for the start
window of the scheduler.
7. After setting up both operations, their status can be checked in the
Customize Scheduled Operations window for each of the nodes as shown
in Figure 20.
Figure 20 Current scheduled operations for node oli
8. For checking the completion of the scheduled operation, display the Console
Events Log, by selecting HMC Management HMC Configuration
View Console Events as shown in Figure21.
Figure 21 Verifying the completion of the scheduled operation