INSTALLATION

PRE-INSTALLATION

1.Make sure there is a 16 amp. 3-pin electrical point preferably with a 16 amp. fuse, within 1 meter of the machine. Make sure it has proper earthing.

2. Fixed

plumbing is

recommended

for

the machine.

The

water inlet of

the

machine has a collar with3/4”parallel

internal threads. The water supply

point with an external 3/4” parallel

thread

should

be

available within1

WATER

 

MACHINE

SUPPLY

REDUCER

WATER

 

 

INLET

STOP

 

 

LOCK

 

 

1/2

3/4

 

meter of the machine’s location.

3. Two options on the water inlet and drain

pipe connection are shown. In case these

possibilities do not exist for the drain pipe,

please arrange an additional length of pipe.

DRAIN

PIPE

WATER INLET

WATER INLET

DRAIN

PIPE

4.Please inform our service centre for installation and demonstration of the machine once the points mentioned above have been completed.

UNPACKING

1.Remove Carton.

2.Remove wooden base. Keep machine on floor or trolley.

3.Place the machine at the site at which it is to be installed.

4.Remove transit bolts.

5.Insert plastic caps provided into holes vacated and press till they click into place.

6.Remove packing from the bottom of the motor

7.Keep transit bolts carefully. They will be required in case you need to shift the machine again.

8.For shifting and re-installation at a new site,please get in touch with our service personnel.

9.Keep packaging material carefully. It comes handy while shifting residence.

10.PLEASE DO NOT OPERATE THE MACHINE TILL TRANSIT BOLTS HAVE BEEN REMOVED.