STEP 6 (See Diagram 6)
A.) Attach the Leg Developer (#5) to the open bracket on the Main Frame (#1). Secure it with one Axle (#42), two M10 x 5/8” Allen Bolts (#30), and two Ø ¾” Washers (#39). Do not over tighten the bolts. Make sure the Leg Developer is able to swivel.
B.) Insert the
C.) Insert three Foam Tubes (#9) halfway through the holes on the Main Frame and Leg Developer. Push six Foam Rolls (#26) onto the Tubes from both ends. Plug six Foam Roll End Caps (#21) into the Tubes from both ends.
D.) Attach the Curl Bar Handle Support (#45) to the bracket on the Leg Developer. Secure it with a
E.) Attach an Olympic Sleeve (#14) onto the weight post on the Leg Developer. Attach a Spring Clip (#15) to the Sleeve.
DIAGRAM 6
11