Impex MD-1559 manual See Diagram 7 & Cable Loop Diagram

Models: MD-1559

1 21
Download 21 pages 54.76 Kb
Page 16
Image 16

STEP 7 (See Diagram 7 & Cable Loop Diagram)

A.) Attach the 129” Lower Cable (#32) to the open bracket on the bottom of the Leg Developer (#7).

B.) Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#69), two Ø ¾” Washers (#80), and one M10 Aircraft Nut (#82).

C.) Draw the Cable underneath the Pulley to the open bracket on the back of Front Vertical Frame. Repeat Step B above to install a Pulley.

D.) Draw the Cable underneath the Pulley then pull the Cable upward to the Crossed Double Floating Pulley Bracket (#17) previously installed in Step-6. Install another Pulley.

E.) Draw the Cable around the Pulley then downward to the open bracket on the Main Base Frame. Install another Pulley.

F.) Pull the Cable around the Pulley then upward to the Double Floating Pulley Bracket (#16) previously installed in Step-5. Install another Pulley.

G.) Draw the Cable around the Pulley then pull downward. Connect the Cable to a C-clip (#50) then connect the C-clip to a Short Chain (#46).

H.) Connect the Short Chain to the bracket on the back of the Front Vertical Frame. Secure it with one M10 x 1” Allen Bolt (#70), two Ø ¾” Washers (#80), and one M10 Aircraft Nut (#82).

I.) Adjust the tension of the Cable by adjusting the length of the Short Chain. For best performance of the machine, adjust the Chain so the Selector Stem (Top Plate) on the weight stack is ¼” above the first plate. While adjusting the weight stack, push down on the Selector Stem to close up the gap then pin the plates. This will remove the slag in the cable system so the range of motion is smooth and tight.

15

Page 16
Image 16
Impex MD-1559 manual See Diagram 7 & Cable Loop Diagram