Impex MSS-1280 manual See Diagram 5 & Cable Loop Diagram

Models: MSS-1280

1 27
Download 27 pages 47.03 Kb
Page 14
Image 14

STEP 5 (See Diagram 5 & Cable Loop Diagram)

A.) Attach the 62” Lower Cable (#26) to the open bracket on the Cross Brace (#7). Attach a Pulley (#33) to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#52), two Ø ¾” Washers (#57), one L-shaped Cable Retainer (#24), and one M10 Aircraft Nut (#58).

B.) Draw the Cable underneath the Pulley then upward to the 170” Upper Cable (#25) installed in Step-4.

C.) Connect the Lower Cable to a Hook (#36). Connect the Hook to the 5-link Chain (#44). Secure the 5-link Chain to the end of Upper Cable with one M10 x 1” Allen Bolt (#51), two Ø ¾” Washers (#57, and one M10 Aircraft Nut (#58). Adjust the tension of the Cable system by moving the Hook position to the Chain. If the tension is too loose then move the hook up the chain. If the tension is too tight then move down the Hook.

D.) Connect the Shiver Bar (#21) to the ball stopper on Lower Cable with two Hooks (#36) and one 15-link Chain (#42).

13

Page 14
Image 14
Impex MSS-1280 manual See Diagram 5 & Cable Loop Diagram