STEP 3 (See Diagram 3)

A.) Attach the Leg Developer (#5) to the bracket on the Front Stabilizer (#6). Secure it with an Axle (#43), two 5/8” Washers (#51), and M8 x 5/8” Allen Bolts (#44).

B.) Attach the Handle Bracket (#10) to the Leg Developer (#5). Secure it with a 2 ¾” L- shaped Pin (#21) and a Spring Clip (#48). Slide the Handle Tube (#17) onto the Handle Bracket. Push two Handle Grips (#28) onto the Handle Tube (#17) from both ends.

C.) Insert one Foam Roll Tube (#16) halfway through the hole on the Front Stabilizer (#6). Insert two Foam Roll Tubes (#16) halfway through the holes on the Leg Developer (#5). Push six Foam Rolls (#27) onto the Tubes from both sides. Plug six Foam Roll Caps (#29) to the ends. Slide the Olympic Sleeve (#11) onto the weight holder in front of the Leg Developer. Attach the Olympic Spring Clip (#47) to the Sleeve.

D.) Attach the Arm Curl Pad (#26) to the Arm Curl Stand (#8). Secure it with two M8 x 5/8” Allen Bolts (#44) and 5/8” Washers (#51).

E.) Insert the Arm Curl Stand (#8) into the top opening on the Front Stabilizer (#6). Secure it with a Lock Knob (#37).

DIAGRAM 3

6

Page 7
Image 7
Impex MWB 758 manual Diagram