STEP 3 (See Diagram 3)
A.) Attach the Leg Developer (#15) to the bracket on the Leg Developer Holder (#16). Secure it with an Axle (#24), two ∅ ¾” Washers (#44), and two M10 x 5/8” Allen Bolts (#38).
B.) Insert one Foam Roll Tube (#21) halfway through the holes on the Leg Developer Holder (#16). Then insert two Foam Roll Tubes (#21) halfway through the holes on the Leg Developer (#15). Push six Foam Rolls (#28) onto the Tubes from both sides. Plug six Foam Roll End Caps (#36) to the ends. Slide the Olympic Sleeve (#27) onto the weight post in front of the Leg Developer. Attach the Olympic Spring Clip (#29) to the Sleeve.
C.) NOTE: When using the decline position to do Ab exercise, place at least 30lbs of weights on the post to hold down the Leg Developer.
DIAGRAM 3
6