STEP 5 (See Diagram 5 & Cable Loop Diagram)
A.) | Attach the 131” Upper Cable (#31) to the opening at the front of the Upper |
| Frame (#4). Note: The Ball Stopper on the cable should be underneath the |
| Frame. |
B.) | Attach a Pulley (#60) to the open bracket. Secure it with one M10 x 1 ¾” Allen |
| Bolt (#69), two Ø ¾” Washers (#80), and one M10 Aircraft Nut (#82). |
C.) | Draw the Cable towards the back of the machine to the open bracket on the |
| Upper Frame. Repeat step B above to install a Pulley. |
D.) | Draw the Cable around the Pulley then pull back towards the opening on the |
| Front Press Base (#11). |
E.) | Attach a Pulley to the opening on the Front Press Base. Secure the Pulley with |
| one M10 x 6 7/8” Allen Bolt (#65) and one M10 Aircraft Nut (#82). |
F.) | Draw the Cable around the Pulley and through the opening to the open bracket |
| on the Front Vertical Beam (#3). Repeat step B above to install another Pulley. |
G.) | Draw the Cable around the Pulley then pull the Cable downwards. Attach the |
| Cable to a Double Floating Pulley Bracket (#16). Install another Pulley. Let the |
| bracket hanging for now. |
H.) | Pull the Cable upward to the open bracket on the back of Upper Frame. Install |
| two pulleys to the bracket. |
I.) | Pull the Cable downward between the two Guide Rods to the Selector Rod |
| (#13). Thread the bolt at the end of the Cable into the opening on top of the |
| Selector Rod (#13) to secure the Cable. |