Ingersoll-Rand manual Assembly of the IR90VR Series Paving Breakers, Cylinder Assembly

Models: IR90VR

1 24
Download 24 pages 45.03 Kb
Page 21
Image 21

ASSEMBLY OF THE IR90VR SERIES PAVING BREAKERS

GENERAL INSTRUCTIONS

Do not repair the tool at the work site. Always take the tool to a repair shop. Never drag the tool on the ground. The air port and other openings will become clogged with dirt and debris.

Before assembly of the breaker, clean all parts thor- oughly and lubricate surfaces with a thin film of recom- mended oil (see Lubrication).

Apply a film of O-ring lubricant to all O-rings before final assembly.

It is recommended that the assembling of the nozzle (2) should be carried out by the manufacturer or authorised distributor.

The existence of a piston air cushion should be deter- mined. Hold the cylinder vertically and allow the piston to drop down the bore small diameter first. An air cush- ion is present if the piston “bounces” at the bottom of the cylinder and no metal to metal contact noise can be heard. If a cushion is not present contact your authorised Ingersoll-Rand repair center for advice.

CYLINDER ASSEMBLY

Grip the cylinder (1) vertically in a vice protected with leather or copper covered vice jaws.

Lubricate and insert the piston (4) small end first into the bore. Check for cushion.

Lubricate and slide the valve ring (34) onto the cylinder (1) and replace valve cover (31).

Position the valve spacer (30) on top of the valve cover (31). Replace the sealing ring (28).

HANDLE ASSEMBLY

If the handle stop (14) was removed during disassembly it should be replaced with a new part as the retaining feature is severed on removal. Locate the stop in the hole in the han- dle and tap sharply into place using a soft drift and hammer. If the hand grip rubbers (10) have been removed these should now be replaced. Lubricate the inside of the rubber with soapy water and slide the new rubber into position. Assemble left and right hand, hand grips (8 and 9), trigger

(7)together with sleeve (13), lubricate around the pivot area and position the sub assembly along the slot in handle body

Note: It is usual to position the trigger lever on the same side as the air inlet of the handle body.

Locate the handle springs (11) between hand grips and han- dle body and fix the assembly in place by drifting or pressing in handle pivot pin (12).

Lubricate the trigger pin (15), trigger ball (16) and replace in the air inlet connection of the handle body.

Note: The trigger pin has a reduced diameter which is placed next to the trigger ball.

Locate the trigger spring (17) on top of the trigger ball. Apply thread retainer (loctite 243, or similar) on the thread of the inlet bushing (18) and tighten to 147 lb. ft (200 Nm) torque. Check that the handles and trigger move freely.

MAIN ASSEMBLY

Lightly grip the cylinder assembly vertically in a vice and position the handle assembly in place.

Note: It is usual to orientate the trigger lever and air inlet 180 degrees from the fronthead bolt groove in the cylinder.

Replace the four handle screws (26) use new handle nuts

(27)and tighten down evenly to a torque of 66.4 lb. ft (90 Nm) torque.

Remove the cylinder and handle assembly from the vice. Replace the muffler (29) on the assembly by tapping the muffler fully home using a hide mallet.

FRONT HEAD ASSEMBLY

Apply a coating of grease then replace spring (21) and plunger (20) in position in fronthead (3).

Position the latch (6) in its slot and secure in place by drift- ing or pressing in outer spring pin (23). Position then press or drift home inner spring pin (22).

Replace fronthead assembly onto cylinder and aligning pinch bolt hole with the cylinder groove.

Replace pinch bolt (24) and nut (25) and tighten a torque of 147 lb. ft (200 Nm) torque.

ASSEMBLY CHECKS

Following service, the breaker should be checked for correct operation prior to being released back to the job site.

Fit the correct size accessory into the breaker and connect to an airline. Using air at low pressure 30 psi (2 bar), check that the breaker is free from air leaks around the inlet con- nection and that the breaker does not automatically start to operate without the trigger being depressed.

Increase the air pressure to 90 psi (6 bar) and run the tool in short bursts to check the tool operates correctly and stops and starts cleanly without hesitation.

Breaker operating frequency should be 960 blows per minute and air consumption 60 CFM (1.85m3/min) at 90 psi (6 bar) air pressure.

21

Page 21
Image 21
Ingersoll-Rand manual Assembly of the IR90VR Series Paving Breakers, Cylinder Assembly