Ingersoll-Rand ML25K, ML50K, ML100K manual For Double Line Hoists, Method, Number of Links

Models: ML50K ML25K ML100K

1 32
Download 32 pages 24.96 Kb
Page 9
Image 9

For Double Line Hoists, Method 1

WARNING: THE REPLACEMENT CHAIN FOR ASERIES MLK DOUBLE LINE HOIST MUST HAVE AN EVEN

NUMBER OF LINKS.

1.Install the load chain through the Hoist pocket wheel as in Step 1 of the instructions for single line Hoist and attach the end of the chain to the Hoist using the anchor bolt and fasteners. Keep the chain straight.

2.Make certain the load chain is straight and feed the end through the bottom hook wheel with the first link ON EDGE.

3.Keep the chain straight and attach the free end to the chain anchor bracket.

WARNING:

Make Certain That The Bottom Hook

Block Has Not Been Flipped Through

The Chain With A Resultant Twist+

Appearance Of

Chain That Has

(Dwg. TPD573)

Appearance Of

Chain That Has

Been Twisted

(Dwg. TPD575)

(Dwg. TPD574)

9

Page 9
Image 9
Ingersoll-Rand ML25K, ML50K, ML100K manual For Double Line Hoists, Method, Number of Links