Jackson TSC-44, TSC-66, TS-66G, TS-44 One of the extra openings in the back of the control box

Models: TS-66G TSC-66GPP TSC-44GP TS-44GP TS-44 TSC-44 TSC-66 TS-66

1 38
Download 38 pages 55.56 Kb
Page 27
Image 27

SECTION 2: INSTALLATION/OPERATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS (CONTINUED)

CHEMICAL FEEDER EQUIPMENT: Detergent may be introduced into the unit through the removal of the bulkhead plug in the rear of the tub and replacing it with the third party detergent injection fitting. Remove the bulkhead plug in the side of the tub to install the detergent concen- tration probe.

For more information concerning detergent concerns, please refer to the page entitled “Detergent Control”.

Brass Plug

Detergent Connection Point

(Machine rear view)

The 1/8” brass plugs on the incoming plumbing rinse injector may be removed to install rinse aid injection fittings.

Brass Plug

 

 

Rear of Control Box

 

 

 

 

 

 

 

 

 

Rinse Injector

All wires for the chemical injectors should be routed through

 

 

 

one of the extra openings in the back of the control box.

Terminals in the control box marked “CVS” provide a constant voltage signal whenever the drive motor is operating.

Terminals in the control box marked “DET” provide a voltage signal whenever the wash motor is operating.

Connection Points

TS Series Conveyors Technical Manual 7610-002-98-29

Issued: 02-15-2006 Revised: N/A

20

Page 27
Image 27
Jackson TS-66G, TSC-66GPP, TSC-44GP, TS-44GP One of the extra openings in the back of the control box