Installing the Faucet Handles
Install the rubber gasket into the faucet handle aligning the flat of the gasket with the projection from the handle, then aligning the flat surface on the stem with the flat inside handle, place the handle onto the stem of the faucet valve.
Insert the
Rotate handles clockwise to the end of travel. Push in inserts with dots oriented toward the outer
edge of the bath rim, red dot indicating hot water and blue dot indicating cold water. The notch in the insert must align with the ribs on the inside of the handles for flush engagement. (See illustra- tion I.)
INSERT
SCREW
FAUCET
HANDLE
RUBBER
GASKET
VALVE STEM
Plumbing Connections
Note: Turn off water at main
Connect the water line from the hot and cold valve to the threaded pipe extension of the fill spout per illustration G or H. Use Teflon tape or thread seal- ant designed for use on plastics. Do not use oil base thread compounds.
For bath fill spout only applications, refer to the suggested plumbing schemes G for separated valves and H for paired valves. If a rim or wall mounted shower is installed, a transfer or mixer valve will be required. Three variations are shown in illustration J (standard shower), K (rim mounted or hand held), and L (shower with
If local plumbing codes require the installation of an
Operation
Check for proper operation of the fill spout. Always fill the bath with a mixture of hot and cold water. Wa- ter temperatures in excess of 140° F may damage the fill spout and/or discolor the bath's surface.
Jacuzzi Whirlpool Bath
I | FAUCET HANDLE ASSEMBLY | |
|
| |
|
| OPTIONAL SHOWER HEAD |
|
| (NOT SUPPLIED) |
|
| TRANSFER VALVE |
|
| (NOT SUPPLIED) |
| COLD WATER | |
| SUPPLY | HOT WATER |
| J | SUPPLY |
HAND HELD SHOWER |
| |
| (NOT SUPPLIED) |
|
TRANSFER VALVE |
| |
(NOT SUPPLIED) |
| |
|
| HOT WATER |
| COLD WATER | SUPPLY |
K | SUPPLY |
|
|
| |
6683000G | 8/06 |
|