JBL AS65C, AS8, AS5, AS SUB setup guide New Construction, After the Drywall is Installed, Step One

Models: AS SUB AS8 AS6 AS5 AS65C

1 12
Download 12 pages 20.9 Kb
Page 6
Image 6

AS Series Owner’s Manual 9/11/98 12:51 PM Page 6

New Construction

Step One:

Remove the grille from the speaker frame.

 

1-1/2"

1-1/2"

1-1/2"

Step Two:

Determine the correct speaker location.

Step Three:

Attach the proper mounting brackets, marked and preset at 3/8", 1/2", 5/8", and 3/4", corre- sponding to the thickness of the dry wall, to the speaker frame.

Step Four:

Nail or screw the speaker-frame assembly to the wall studs and route the wires through the frame opening.

After the Drywall is Installed

Step Five:

Step Six:

Step Seven:

Cut the drywall.

Connect the speaker wires to

Replace the metal grille.

 

the baffle assembly and install

 

 

baffle assembly in frame. Do

 

 

not overtighten the baffle

 

 

screws.

 

Page 6
Image 6
JBL AS65C, AS8, AS5, AS SUB setup guide New Construction, After the Drywall is Installed, Step One