INSTALLATION INSTRUCTIONS

WARNING

Electrical Shock Hazard

Disconnect electrical power at the fuse box or circuit breaker box before installing dishwasher.

Failure to do so can result in death or electrical shock.

Prepare Cabinet Opening—Existing

Utilities

If the water line and the cable extend to the locations shown, proceed to the “Install Drain Hose” section. If they do not reach far enough, follow the instructions in the “Prepare Cabinet Opening— New Utilities” section.

Prepare Cabinet Opening—New Utilities

Prepare and route the electrical supply

Option A, Power Supply Cord:

NOTE: A grounded 3 prong outlet is required inside a cabinet next to the dishwasher cabinet opening.

Drill a 1¹⁄₂" (3.8 cm) hole in cabinet side or rear.

See “Product and Cabinet Opening Dimensions” section.

7

Page 7
Image 7
Jenn-Air W10418362B Prepare Cabinet Opening-Existing Utilities, Prepare Cabinet Opening-New Utilities