John Lewis JLBIGH753 instruction manual Building in, Building over a cupboard or drawer

Models: JLBIGH753

1 24
Download 24 pages 59.09 Kb
Page 14
Image 14
Building in

Building in

IMPORTANT: This hob must be installed according to the instruction supplied, and by qualified and competent personnel to the relevant National Standards.

Please ensure that when the hob is installed it is easily accessible for the engineer in the event of breakdown.

Building over a cupboard or drawer

If the hob is to be installed above a cupboard or drawer it will be necessary to fit a heat resistant board below the base of the hob on the underside of the work surface.

It is also recommended to carry out the electrical connection to the hob as shown in diagrams 1 and 2.

1

ON/OFF SWITCH

FLEX

 

OUTLET

 

2

ON/OFF SWITCH

 

FLEX

OUTLET

14

Page 14
Image 14
John Lewis JLBIGH753 instruction manual Building in, Building over a cupboard or drawer