1.Install this air handler only in a location and position as specified in SECTION III of these instructions.

2.Always install the air handler to operate within the air handler’s intended maximum outlet air temperature. Only connect the air handler to a duct system which has an external static pressure within the allowable range, as specified on the air handler rating plate.

3.When an air handler is installed so that supply ducts carry air cir- culated by the air handler to areas outside the space containing the air handler, the return air shall also be handled by duct(s) sealed to the air handler casing and terminating in the space to be cooled/heated.

4.The air handler is not to be used for temporary heating of buildings or structures under construction.

5.The size of the unit should be based on an acceptable heat loss or gain calculation for the structure. ACCA, Manual J or other approved methods may be used.

SAFETY REQUIREMENTS

1.This air handler should be installed in accordance with all national and local building/safety codes and requirements, local plumbing or wastewater codes, and other applicable codes.

2.Refer to the unit rating plate for the air handler model number, and then see the dimensions page of this instruction for supply air ple- num dimensions in Figure 3. The plenum must be installed accord- ing to the instructions.

3.Provide clearances from combustible materials as listed under Clearances to Combustibles.

4.Provide clearances for servicing ensuring that service access is allowed for electric heaters and blower.

5.Failure to carefully read and follow all instructions in this manual can result in air handler malfunction, death, personal injury and/or property damage.

6.Check the rating plate and power supply to be sure that the electri- cal characteristics match.

7.Air handler shall be installed so the electrical components are pro- tected from water.

8.Installing and servicing heating/cooling equipment can be hazard- ous due to the electrical components. Only trained and qualified personnel should install, repair, or service heating/cooling equip- ment. Untrained service personnel can perform basic maintenance functions such as cleaning and replacing the air filters. When working on heating/cooling equipment, observe precautions in the manuals and on the labels attached to the unit and other safety precautions that may apply.

9.These instructions cover minimum requirements and conform to existing national standards and safety codes. In some instances these instructions exceed certain local codes and ordinances, especially those who have not kept up with changing residential and non-HUD modular home construction practices. These instructions are required as a minimum for a safe installation.

INSPECTION

As soon as a unit is received, it should be inspected for possible dam- age during transit. If damage is evident, the extent of the damage should be noted on the carrier’s freight bill. A separate request for inspection by the carrier’s agent should be made in writing. Also, before installation the unit should be checked for screws or bolts, which may have loosened in transit. There are no shipping or spacer brackets which need to be removed.

Also check to be sure all accessories such as heater kits, suspension kits, and coils are available. Installation of these accessories or field conversion of the unit should be accomplished before setting the unit in place or connecting any wiring, electric heat, ducts or piping.

LIMITATIONS

These units must be wired and installed in accordance with all national and local safety codes.

Voltage limits are as follows:

Air Handler Voltage

Voltage code

1Normal Operating

Voltage Range

 

 

208/230-1-60

06

187-253

1. Rated in accordance with ARI Standard 110, utilization range “A”.

Airflow must be within the minimum and maximum limits approved for electric heat, evaporator coils and outdoor units.

 

Entering Air Temperature Limits

 

Wet Bulb Temp.°F

Dry Bulb Temp. °F

Min.

Max.

Min.

Max.

57

72

65

95

SECTION III: UNIT INSTALLATION

CLEARANCES

Clearances must be taken into consideration, and provided for as fol- lows:

1.Refrigerant piping and connections - minimum 12” recommended.

2.Maintenance and servicing access - minimum 36” from front of unit recommended for blower motor/coil replacement.

3.Condensate drain lines routed to clear filter and panel access.

4.Filter removal - minimum 36” recommended.

5.The ductwork and plenum connected to this unit are designed for zero clearance to combustible materials.

6.A combustible floor base accessory is available for downflow applications of this unit, if required by local code.

LOCATION

Location is usually predetermined. Check with owner’s or dealer’s installation plans. If location has not been decided, consider the follow- ing in choosing a suitable location:

1.Select a location with adequate structural support, space for ser- vice access, clearance for air return and supply duct connections.

2.Use hanging brackets to wall mount this single piece air handler unit, is not recommended.

3.Normal operating sound levels may be objectionable if the air han- dler is placed directly over some rooms such as bedrooms, study, etc.

4.Select a location that will permit installation of condensate line to an open drain or outdoors allowing condensate to drain away from structure.

NOTICE

The primary and secondary drain line must be trapped to allow proper drainage of condensate water. If the secondary drain line is not used, it must be capped. The coil is provided with a secondary drain. It should be piped to a location that will give the occupant a visual warn- ing that the primary drain is clogged. If the secondary drain is not used it must be capped.

5.Proper electrical supply must be available.

6.If unit is located in an area of high humidity (ie: an unconditioned garage or attic), nuisance sweating of casing may occur. On these installations, unit duct connections and other openings should be properly sealed and a wrap of 2” fiberglass insulation with vinyl vapor barrier should be used.

2

Johnson Controls Unitary Products

Page 2
Image 2
Johnson Controls AV*(C) Series installation manual Section III Unit Installation

AV*(C) Series specifications

Johnson Controls has long been a leader in the field of building management systems, and the AV*(C) Series is a testament to its commitment to innovation and excellence. Designed with the modern-day facility in mind, the AV*(C) Series combines advanced features, cutting-edge technologies, and robust characteristics to deliver top-tier performance and reliability for building operations.

One of the standout features of the AV*(C) Series is its exceptional flexibility. The series offers a range of controller options that cater to various application needs, ensuring that building managers can tailor their systems to suit specific requirements. This adaptability is complemented by its scalable architecture, which allows for seamless expansion as building needs evolve over time.

Another major highlight of the AV*(C) Series is its intuitive user interface. The system provides an easy-to-navigate platform that simplifies monitoring and control tasks. Users can access real-time data and analytics at their fingertips, enhancing decision-making processes and enabling proactive management of building systems. The graphical display is user-friendly, making it simple for facility staff to respond promptly to any operational issues.

In terms of technology, the AV*(C) Series integrates advanced communication protocols such as BACnet, which ensures interoperability with various building automation systems. This technology ensures that different devices can communicate effectively, streamlining the overall operation of the facility. The controllers also support multiple I/O configurations, which allow for greater customization and setup flexibility.

Energy efficiency is at the forefront of the AV*(C) Series design. The system incorporates intelligent algorithms that optimize energy usage, helping organizations reduce their carbon footprint and operational costs. By continuously monitoring system performance and adjusting settings in real-time, the AV*(C) Series contributes to sustainable building management.

Reliability is also a hallmark of the AV*(C) Series. Built with durable components and designed to withstand diverse environmental conditions, it ensures consistent performance and longevity. The system features redundant power supplies and robust fail-safes to keep operations running smoothly, minimizing downtime.

In conclusion, the Johnson Controls AV*(C) Series is an advanced solution for building management that combines flexibility, user-friendly design, cutting-edge communication technology, energy efficiency, and reliability. These characteristics make it an excellent choice for organizations looking to enhance their facility operations and improve overall performance.