JVC VN-H217U specifications Examination

Models: VN-H217U

1 11
Download 11 pages 25.15 Kb
Page 10
Image 10
3.02EXAMINATION

Section 28.23.29 Video Surveillance Remote Devices and Sensors

1.Engage Installer with [license] [certification] [specify type] as required by the [State of] [City of] with demonstrated successful experience designing, installing, commissioning, training and servicing closed circuit television systems

2.Installer shall have completed factory approved training and be certified by the manufacturer as qualified to install, operate and maintain product(s) specified

B.Install the system in accordance with the equipment manufacturers recommended procedures

C.Install system using generally acceptable industry practices for closed circuit television systems

D.Install system using generally acceptable industry practices for network appliances

E.Ensure system and network configuration is fully coordinated with the Owner’s Information Technology Department.

Specifier Note: The following may be deleted for projects of smaller scope in which full Division 1 project documentation is not provided or required. It is recommended that performance requirements be specified within the project documentation to ensure proper configuration and operation of the system. Contact your JVC Representative for assistance in developing a system performance specification specific to a particular project.

F.Ensure system and all related components are configured to support performance requirements outlined in Division 1, 01.86.33 Electronic Safety and Security Performance Requirements

3.02EXAMINATION

Specifier Note: There are often changes to building interior structures during the course of construction. It is imperative as built mounting locations be assessed to ensure the desired field of view can be achieved. Owners often require very specific views of their facility and physical changes to the structure may prevent ideal mounting locations. Coordinate and/or revise Division 1, Section 01 86 33 Electronic Safety and Security Performance Requirements

A.Verification of Conditions:

1.Ensure wiring cable chase requirements are available

2.Ensure substrate for physical mounting locations meet manufacturer recommendations

B.Examination and Assessment:

3.03FIELD QUALITY ASSURANCE

A.Provide Manufacturer Field Engineering Support for engineering, installation, testing and commissioning assistance as required in Division 1.

3.04 COMMISSIONING

Specifier Note: The following may be deleted for projects of smaller scope in which full Division 1 project documentation is not provided or required. It is recommended that performance requirements be specified within the project documentation to ensure proper configuration and operation of the system. Contact your JVC Representative for assistance in developing performance specification specific to a particular project.

A. Testing: Ensure system operates to manufacturers specifications

© Copyright 2011, Victor Company of Japan, Limited. All rights reserved. “JVC” is the trademark or registered trademark of Victor Company of Japan.

All non-metric weights and measures are approximate. Features and specifications are subject to change with out notice.

MasterFormat, SectionFormat and PageFormat are trademarks of the Construction Specification Institute.

10 of 11

VN_H217U/VPU_V.1_00

Page 10
Image 10
JVC VN-H217U specifications Examination