27.

Brew Tank

“27: BREW 12A?”

Heating Element on

Press Right Button

 

Heating Element

“MODULES: POWER,

for 3 seconds –

if OK, Center Right

 

power

HWT”

Verify 12A

to repeat

 

 

R LED blinks

 

 

28.

Preheat Tank

“28: PRE 12A?”

Heating Element on

Press Right Button

 

Heating Element

“MODULES: POWER,

for 3 seconds –

if OK, Center Right

 

power

HWT”

Verify 12A

to repeat

 

 

R LED blinks

 

 

29.

Transmit and receive

“29: VEND I/F

 

Auto Continue if

 

a “1” and “0”

LOOPBACK”

 

OK

 

through the coin IF

“MODULE: M-PCB,

 

 

 

 

PWR-PANEL”

 

 

30.

Done

“30: PASS, !!!!”

Power off

Stop

 

 

“DONE”

 

 

Test 20 pressurizes the entire hot water part of the brewer, thus checking for leaks in:

• All vent line components from the tank through the VV.

Tested open in 19

The HWT

All fill line components from the HWT through the CWP. Tested open in 21

All brew line components.

Not tested open

Test 21 pressurizes the cold water part of the brewer, thus checking for leaks in:

The vent line from the CWT to the bin.

Not tested open

The CWT

 

The tube from the CWT to the CWP.

Tested open in 18

The inlet valve and high pressure tubing. (to 4 psi)

Not tested open

Some components are not tested:

Float valve

CWT and HWT drains open

Dispense line from Dispense Valve to Mug

Thermostats opening and Thermostat sensors seeing opens

Conductive probes and power

Inlet Valve

Hi-Pot

The second CWP

The coin IF loop back plug shorts the transmit to receive pin (RJ11 pins 3 and 4).

B3000 SERVICE MANUAL

 

60-200807-000, REV C

91