Assembly
Step 8
Slide the Right Pec Dec Arm (22) on to the shaft of the Pec Dec Mount (21). Secure the arm in place using one Big Washer (102), one Washer (143), one Spring Washer (119), and one Allen Bolt (128).
Slide Pec Dec Handle Bar (24) onto the top of the Right Pec Dec Arm (22) and secure using one Chrome Washer (101), one Washer (143), one Spring Washer (119), and one Allen Bolt (128).
Repeat this step to complete the Left Pec Dec assembly.
Figure 8
22