Wiring belween motor and blower box iS not provided.
II supply mnnec,,on at llle lop
Wall Installations
. Use caulking compound belwee” mou”:,r”; ilar:- and wall
Roof lnstallatlons
. Follow standard roof,“g procedures
The llashlng sheet should be Bnlered over 1’1s oper.~“g I” Ihe roof
The lower edge o: Ihe flash’ng should IIB on lop ‘oi tile shingles and Ihe upper edge should be uldernealh Ihe sh,ng,es
Seal Ihe assembly belwee” rhe rool la” a?d lla 71”; KII~ rooltng mask lo prevenl ieaks
.Connect 9’ ouctwork 10 blower due 113PoWon ductwork ,o avo,d wall slrds
and lloor jo1s1s Complele all ductwork. Use duct tape lo seal all ,o~“ls Ven~cal
ductwork lor wall mounled ~nslallal,ons should p,,ch down sl~ghlly loward the venl lo allow mo~sl”~ lo run lo ouls,de
connector. Thread wares lrom motor conduil lhrough condull connector and lhrough !he o~en~“q of Ihe WI~I”~ box Tlahte” Ihe conduit Co”“BctOl screws
Connect Ihe red we lrom the mo!or 10
Ihe red wre from !he switch us,“g a
mLilt 11,~asn~drsll van, back ,“,o pos,,,o? Use !WL mo”n!,“g screws lo seclire Ihe
. downcra!r “en, through the Iop 01 Ihe counlerlop (one on each side) If you are
only “song Ihe t&o s,de mou”:,“g screws, wsel? sc:ews But Do Nol ughlen a, Ims t,me
Place a level aga,“st Ihe lace 01 Ihe blower El , box Lswer legs 10 lloor of cablnet Adjust pos~!~o” oi legs ~“111blower housing 18level Mark and drill s,all,“g holes for screws lhat VIII auach
legs lo cabInal Secure legs lo cablnel lloor Check aga~n lhat blower housing 1s level Tlghle” Ihe screws lhat aitach the lqs lo Ihe blower box
D!i. Lse lMi0 moLnl,ng screws ;o secure cowndran “en! to ,ne sides 01
counterlop c”:wI If the side moun,,“g screws v,ere lKse”*o 11 S!ep 8 !Igh!er screws now
|
| Uelemne | the | localion | where | Ihe |
|
| dx~erior | blower | assembly | ~111be | |
| . | nslalled | Cul | a 10’ diameter | hole | |
ml | 1 !he wall or roe, |
|
| |||
|
|
|
;/, - “\,-;
Q
r 7
/14Remove Ihe dome lop Loose” Ihe , ~,‘a,” relic1 screws Thread Ihe
molar w,nng through the strain reltel. Tlghlen Ihe screws on the slra” rel~el Conneci Ihe while and black w,res 01 Ihe motor n’:,“g cable lo Ihe while and black leads of Ihe motor wI,h
Connect Ihe green. grounding wire of Ihe motor w r,ng cable lo Ihe grounding connecl~o” sc,ew Place w,res under clip lo preven, hilling Ihs motor cooling b,aee
Run motor wlnng lhrough Ine dLc.1 access area lo the w,r,“g box on !ye blower box
For
mnne*,ons. Roof lnslallallons requ,re a roof cap lo be used I” place 01 Ihe come
El Remove tile wlr,“g box cover screw
. Place co”er and screw I” a safe zlace Pull ,wres tlrough ope”,rg
I-I
120Loose” Ihe screws on ,he lower conad,,
. conneclor Thread Ihe power suppiy cable through Ihe condull mnneclor
Tlghlen the screws on Ihe condull co”“exor Disconnect power supply.
Conned the lhree, while w,res logelher w,,h a w,re conneclol
Connect Ihe three, green, grou”d,“g w,res logelher wllh a w!re connector Connect Ihe IWO t,lacn w,:es together wllh a w\re connector
Replace wlrlng box cower
j211Turn power supply on Cleck the
. operal~on of Ihe blower, bpeed conlro: and lndlcalor llghl ti one does not
opsrale, dlswnnecl power source and check lhal w,re mnnecl~on~ have bee” made cone+.
COYal “sing e four screws removed I”
Instail cooklop arxord~na 13 ,“s,a!Ie’,zn ~“slr~cl~ons prov,ded WI h :he co&o;,
To get the most efficient use
from your new downdraft vent, read the Use and Care
Information section on the back cover. Keep Installation Instructions and Use and Care Guide close by for easy reference.
PANEL E