Kobe Range Hoods CH7642SQB, CH7648SQB Preparation before Installation, Hood Installation

Models: CH7630SQB CH7636SQB CH7648SQB CH7642SQB

1 35
Download 35 pages 41.96 Kb
Page 8
Image 8
Preparation before Installation

UNDER THE CABINET INSTALLATION

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING.

Decide the location of the venting pipe from the hood to the outside. Refer to Figure 1.

A straight, short vent run will allow the hood to perform more efficiently.

Try to avoid as many transitions, elbows, and long run as possible. This may reduce the performance of the hood.

Temporarily wire the hood to test for proper operation before installing.

Important: Peel protective film off the hood, if any.

Use duct tape to seal joints between pipe sections.

For installing under the cabinet with recessed bottom, attach 4-inch wide wood filler strips (not provided) on each side. Refer to Figure 2.

Using references in TABLE 1 and Measurements and Diagrams on page 18, create access opening for electrical wires and hood exhaust under the cabinet.

Figure 1

Figure 2

.

Hood Installation

Figure 3

•Important: Peel protective film off the hood, if any. CAUTION: If moving the cooking range is necessary to install the hood, turn off the power on an electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE.

1.Puncture the knockout holes (for mounting under the cabinet) on the hood as shown in Figure 3.

2.If necessary, attach two rubber stands (provided) with 3M adhesive tapes

(provided) to the back corners of the hood.

3.Using references in TABLE 1 and Measurements and Diagrams on page 18 center the hood beneath the cabinet and flush with the front of the cabinet.

6

Page 8
Image 8
Kobe Range Hoods CH7642SQB, CH7648SQB, CH7636SQB, CH7630SQB Preparation before Installation, Hood Installation