Kobe Range Hoods CH7630SQB Hood Preparation before Installation, Stand Alone Installation

Models: CH7630SQB CH7636SQB CH7648SQB CH7642SQB

1 35
Download 35 pages 41.96 Kb
Page 11
Image 11
•Important: Peel protective film off the hood and duct covers, if any.

STAND ALONE INSTALLATION

***This installation only applies if installing with the CH1120DC duct cover.

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING.

Decide the location of the venting pipe from the hood to the outside. (Figure 8)

A straight, short vent run will allow the hood to perform more efficiently.

Try to avoid as many transitions, elbows, and long run as possible. This may reduce the performance of the hood.

Temporarily wire the hood to test for proper operation before installing.

Important: Peel protective film off the hood and duct covers, if any.

Use duct tape to seal joints between pipe sections.

If necessary, prepare back wall frame with cross framing lumber for secure installation.

Using references in TABLE 2 and measurements on pages 19-21, determine the level of the lumber. (Figure 9)

Figure 8

Figure 9

Hood Preparation before

Installation

If necessary, attach two rubber stands (provided) with 3M adhesive tapes

(provided) to the back corners of the hood.

Attach the outer duct cover-mounting bracket {K} (provided) to the hood- mounting bracket {F} (provided) with two (3/16” x 1/2”) screws (provided) as shown in Figure 10.

Attach the hood-mounting bracket {F} to the back of the hood with six (3/16” x 1/2”) screws (provided) as shown In Figure 11.

Hood Installation

Figure 10

Figure 11

Hood Preparation beforeCAUTION: If moving the cooking range to install the hood is necessary, turn off the power on an electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE.

9

Page 11
Image 11
Kobe Range Hoods CH7630SQB, CH7642SQB Hood Preparation before Installation, Stand Alone Installation, Hood Installation