Kobe Range Hoods RA0230SQB, RA0248SQB Hood Installation, Wiring to Power Supply, Safety Warning

Models: RA0236SQB RA0230SQB RA0242SQB RA0248SQB

1 76
Download 76 pages 1.93 Kb
Page 10
Image 10
Hood Installation

Hood Installation

CAUTION: MAKE SURE HOOD IS SECURE BEFORE RELEASING. CAUTION: If required to move the cooking range to install the hood, turn off the power on an electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE.

1. Using references in Table 1 and measurements on Page 5, mark the leveling locations point for hood-mounting bracket on the wall.

2.Secure two mounting screws (not provided) to the wall, leaving an 1/8” space from the wall. (Figure 5)

3.Align the hood-mounting bracket to the mounting screws on the wall and hang hood into place.

4.Secure and tighten the mounting screws.

CAUTION: MAKE SURE HOOD IS SECURE BEFORE RELEASING.

Wiring to Power Supply

Wiring to Power SupplySAFETY WARNING

RISK OF ELECTRICAL SHOCK. THIS RANGE HOOD MUST BE PROPERLY GROUNDED. MAKE SURE THIS IS DONE BY SPECIALIZED ELECTRICIAN IN ACCORDANCE WITH ALL APPLICABLE NATIONAL AND LOCAL ELECTRICAL CODES. BEFORE CONNECTING WIRES, SWITCH POWER OFF AT SERVICE PANEL AND LOCK SERVICE PANEL TO PREVENT POWER FROM BEING SWITCHED ON ACCIDENTALLY.

5.Connect the electrical wires.

-Connect three wires (black, white and green) to house wires and cap with wire connectors. Connect according to color: black to black, white to white, and green to green as shown on Figure 6.

-If necessary to hide the electrical wire connections, push wires back into the wiring box. Access the wire connections underneath the hood. Make sure wires do not slip between motor or any moving parts to prevent any damage.

Figure 5

Figure 6

Figure 7

7

Page 10
Image 10
Kobe Range Hoods RA0230SQB Hood Installation, Wiring to Power Supply, Caution Make Sure Hood Is Secure Before Releasing