Kohler 8030A manual Install the Support Framework, Install the Finished Ceiling

Models: 8030A

1 10
Download 10 pages 42.48 Kb
Page 5
Image 5
Install the Support Framework

Install the Support Framework

 

 

Existing

229mm

Ceiling

Joist

 

2 x 4

368 mm

(50 mm x 100 mm)

2 x 2

Typical

 

(50 mm x 50 mm)

 

 

2 x 4

 

50 mm x 100 mm)

Pressure

30 mm

 

Balancing

2 x4

Loop

Existing (50 mm x 100 mm)

 

Ceiling Joist

2 x 2

(50 mm x 50 mm)

2 x 4

(50 mm x 100 mm)

Existing

Ceiling

Joist

1.Construct the support framework as shown in the above diagram.

The 2 x 2 should be offset 30 mm from the edges of the 2 x 4’s to support the pressure balancing assembly at the correct depth.

2.Install the support framework under the pressure balancing loop(s) as illustrated.

The face of the 2x4’s should be installed flush with the face of the existing ceiling joists.

Install the Finished Ceiling

Tee

57 mm Min

Finished Ceiling

Cutout

229 mm -

235 mm

 

Finished

229 mm -

229 mm -

Ceiling

235 mm

Cutout

 

235 mm

Tee

 

Nipple

1.Install the water-resistant board.

2.Cut out a 229 mm to 235 mm square at the desired installation location.

3.Install the finished ceiling material.

5

1071288-AN2-F 09/03/12

Page 5
Image 5
Kohler 8030A manual Install the Support Framework, Install the Finished Ceiling