Krell Industries 400 Unpacking and Placement, Opening the Evolution Amplifier Shipping Carton

Models: 400 900 Evolution 600

1 34
Download 34 pages 23.53 Kb
Page 11
Image 11
Unpacking and Placement

SECTIONTWO

Unpacking and Placement

This section describes the procedures for safely unpacking and placing your Evolution amplifier. The amplifier and accessories are shipped in 1 carton. The dimensions of the amplifier are shown in the specifications section starting on page 31.

Two people are needed to remove the Evolution amplifier from its shipping box safely and easily.

Opening the Evolution Amplifier Shipping Carton

1.Open the shipping carton and remove the top layer of foam. The carton con- tains these items:

1 Evolution amplifier chassis

1 20 amp AC power cord

1 12 VDC (12 V trigger) cable

1 Packet containing the Quick Setup Guide and the warranty registration card

2.Orient the shipping box so that one person stands at the front of the amplifier and one person stands at the back of the amplifier. Both people need to grab a pair of the cardboard handle cutouts (one pair located at the front of the amplifier and one pair located at the back of the amplifier) and simultaneously lift the amplifier straight up, out of the carton. Bend and lift with your knees, not your back.

3.Place the amplifier in a safe location, and remove the protective plastic wrap- ping.

Note

Save all packing materials. If you need to ship the Evolution amplifier in future, repack the unit in its original packaging to prevent shipping damage.

continued

11

Page 11
Image 11
Krell Industries 400, Evolution 600, 900 manual Unpacking and Placement, Opening the Evolution Amplifier Shipping Carton