Standard installation

1

Rough in

2

Back-to-back installation

 

 

 

Dimensions

 

 

 

Standard installation:

Back-to-back installation:

 

 

 

 

 

 

 

 

 

3 port valve, shower only:

Shower only

Tub / shower

 

 

 

 

 

 

 

 

 

Position valve with outlet up. Finished wall must be within the

 

 

 

 

 

 

 

 

 

dimensions shown on finished wall template.

 

 

 

 

4 port valve, tub and shower:

 

 

 

 

Position valve with shower outlet marked "S" up and the tub outlet

 

 

 

 

marked "T" down.

 

 

 

 

Finished wall must be within the dimensions shown on finished wall

810mm

 

 

 

template.

 

 

 

 

32"

 

1150mm

 

 

 

 

45"

 

 

 

1980mm

!

Finished wall template must remain intact for finished

 

wall surface measurements and as a template for

 

78"

 

plastering and / or tiling.

 

 

 

1170mm

 

840mm

!

It is not necessary to remove the pressure balancing

46"

 

cartridge from the valve during normal soldering of

 

33"

 

 

connections, using propane-butane gas. Do not use

 

 

 

 

 

 

 

OXYGEN-ACETYLENE!

 

Floor

 

When soldering connections, do not use excessive

 

 

line

!

 

 

 

heat!

 

 

 

 

 

Back-to-back

installation:

 

To test the pipe joints, pressurize both hot and cold

!

 

inlets!

In back-to-back installations, cartridge must be

 

 

 

rotated 180° to ensure proper valve operation.

 

 

/

MINIMUM

58mm / 2 9/32"

MAXIMUM

 

179mm / 7 1/32"

 

39mm / 1 17/32"

 

96mm / 3 25/32"

 

K.37.P4.01

1/2" FPT

102mm

4"

Inlet: hot water

Inlet: cold water

MINIMUM

MAXIMUM

67mm 70mm

180mm / 7 1/8"

1/2" FPT

2 5/8" 2 3/4"

86mm 3 3/8"

1/2" FPT

+

K.37.P4.02

1/2" FPT

 

Inlet:

 

 

 

58mm / 2 9/32"

cold

 

water

 

 

 

179mm / 7 1/32"

Inlet:

MINIMUM

 

hot

39mm / 1 17/32"

 

MAXIMUM

 

water

 

 

96mm / 3 25/32"

 

 

 

 

140mm / 5 1/2"

81mm / 70mm 3 3/16" 2 3/4"

100mm / 3 15/16"

180mm / 7 1/8"

K.37.P4.03

Inlet: hot water

1/2" FPT

1/2" FPT

Inlet: cold water

MINIMUM

MAXIMUM

Page 2
Image 2
KWC 802 141 Shower only Tub / shower, Wall surface measurements and as a template for, Plastering and / or tiling, Heat