Table of Contents
Section 1: Assembly and Set-Up
Tools Required
•Fork lift, crane hoist or
•Impact wrench or socket and ratchet set (English & metric)
•Rubber mallet
•
•Drift pins
•Screwdriver
•Safety shoes, safety glasses and gloves. A hard hat should be worn by anyone working under the crane.
DM3705
DM3706
Assembly Preparation
Having all parts and equipment readily at hand will speed up your assembly task and make the job as safe as possible.
Prepare Disc Mower assembly area by removing other equipment and then sweeping it clean of dust and contaminants.
NOTE: Remove heavy components from crate with a hoist or
Raise
Your cutter bar is shipped assembled and must be checked for correct cutter plate arrangement. Figure
Also shown in Figure
DM3707
15144
Cutter Bar Plate Rotation
Figure
Gearbox and Cutter Bar Lubrication
The gearbox and cutter bar should arrive filled with SAE 90 GL4 (EP) gear lube. However, you should check oil level in both before using and add oil if necessary.
IMPORTANT: The recommended quantity of cutter bar oil should not be exceeded. Results of overfilling will be overheating with potential for severe damage to the cutterbar.
Additional instructions and specifications for gearbox and cutter bar are provided as noted below:
Gearbox Lubrication . . . . . . . . . . . . . . . . . . . .page 23
Cutter Bar Lubrication. . . . . . . . . . . . . . . . . . .page 24
Gearbox Specifications. . . . . . . . . . . . . . . . . .page 25
Cutter Bar Specifications . . . . . . . . . . . . . . . .page 25
8 | DM3705, DM3706, and DM3707 Series Disc Mowers | 9/15/06 |