Land Pride

Assembly Instructions

23706

Front Rack Assembly To Heavy Duty Brush Guard

Series 00 & 10 ST Trekers

Figure 2

Assembly Instructions for

Kit No’s. 701-122A and 701-126A

Front Rack mounted to Heavy Duty Brush Guard (Reference Series 00 &10 ST Trekers)

Refer to Figure 2:

1.Remove plastic end caps (#11) from the Heavy Duty Brush Guard (#6).

2.Attach adapter bracket (#5) to Heavy Duty Brush Guard with 5-16"-18 x 3/4" lg. GR5 hex bolts (#8) and 5/16" hex locknuts (#10). Do not tighten.

3.Align front two tabs on the Front Rack (#2) with holes in the adapter bracket (#5) as shown. Insert two 5/16"-18 x 1-1/2 GR5 Bolts (#8) through the Front Rack and adapter bracket. Secure with 5/16" hex lock nuts (#10). Do not tighten.

4.Attach back two tabs on Front Rack (#2) to the four post accessory bar (#1) with 1-1/2" U-Clamps (#3), 5/16" x 2" Carriage Bolts (#7), and 1 1/8" long Spacers (#4), Secure with 5/16" hex lock nuts (#9). Do not tighten.

5.Adjust Front Rack (#2) to be level and centered on the Treker.

6.Tighten all 5/16" hex lock nuts (#9 & #10) to 17 ft. lbs of torque.

7.Replace plastic end caps (#11).

2/23/07 ■

Manual No. 701-123M

3

Page 3
Image 3
Land Pride 701-126a, ST Front Rack, 701-053a, 701-122a, 701-171a Assembly Instructions for Kit No’s -122A and 701-126A