Land Pride

Assembly Instructions

24818

Front Rack Assembly To Heavy Duty Brush Guard

Series 20 ST Trekers

Figure 1

Assembly Instructions for

Kit No’s. 701-171A and 701-126A

Front Rack mounted to Heavy Duty Brush Guard (Reference Series 20 ST Trekers)

Refer to Figure 1:

1.Remove plastic end caps (#6) from Heavy Duty Brush Guard (#1).

2.Attach adapter bracket (#3) to Heavy Duty Brush Guard with 5/16"-18 x 3/4" lg. GR5 hex bolts (#4A) and 5/16" hex locknuts (#5). Do not tighten.

3.Remove only the top two accessory bar mounting screws (#4B). Do not remove screws (#4C). Pivot front rack (#7) up at the front and attach rack top mounting holes to the accessory bar top mounting holes with existing mounting screws (#4B). Draw mounting screws up snug. Do not tighten.

4.Remove only the bottom two accessory bar mounting screws (#4C) and pivot front rack down. Reinstall mounting screws (#4C) and draw up snug.

5.Insert two 5/16"-18 x 1-1/2 GR.5 Bolts (#4D) through Front Rack (#7) and adapter bracket (#3). Secure with 5/16" hex lock nuts (#5). Do not tighten.

6.Adjust the Front Rack (#7) to be level and centered on the Treker.

7.Tighten all 5/16" hex head bolts (#4A, 4B, 4C & 4D) to 17 ft-lbs. of torque.

8.Replace plastic end caps (#6).

2

Manual No. 701-123M

■ 2/23/07

Page 2
Image 2
Land Pride 701-122a, ST Front Rack, 701-053a Assembly Instructions for Kit No’s -171A and 701-126A, Refer to Figure