UNPACKING AND INSTALLATION

This chapter provides unpacking and installation information for GSW-1675T.

Unpacking

Open the shipping cartons of GSW-1675T and carefully unpacks its contents. The carton should contain the following items:

One 16-Port 10/100/1000Mbps Gigabit Ethernet Web Smart Switch

One AC power cord, suitable for your area’s electrical power connections

Four rubber feet to be used for shock cushioning Screws and two mounting brackets

CD-Rom with Web Management Utility and User’s Guide

If any item is found missing or damaged, please contact your local reseller for replacement.

Installation

The site where you install the hub stack may greatly affect its performance. When installing, consider the following pointers:

Install GSW-1675T in a fairly cool and dry place. See Technical Specifications for the acceptable temperature and humidity operating ranges.

Install GSW-1675T in a site free from strong electromagnetic field generators (such as motors), vibration, dust, and direct exposure to sunlight.

9

Page 15
Image 15
LevelOne GSW-1675T manual Unpacking, Installation