更多难得资料请到江南家电维修论坛免费下载! http://bbs.520101.com

10.ISP Download (option)

10.1Overview

The Micom upgrade via the external port for the service for the customer.

10.2Device to use

1) PC

2) B/D for the interface (IIC & ISP)

3) Jig for downloading (for the power supply)

10.3Adjustment wiring diagram (Download device configuration diagram)

Main B/D

Interface B/D

10.4 Adjustment condition (Download condition)

-IC name & Circuit number: MYSON MTV416GMF & IC4015

-Power supply: 5V (P4004 Pin 3)

-SCL: D-sub Pin 10

-SDA: D-sub Pin 7

3)Click the Load File Button, and select the desired Hex File to download.

(If no file is displayed, make sure that the file format is selected as Hex file (*.hex))

10.5 How to adjust (for downloading)

1)fter executing LGE Monitor Tools v1.1, click the first icon. (See the figure)

2) When the screen is displayed as shown at the below figure, set the items as follows:

- MCU Select: MTV512M64

4) Click 'Send Button'

- R/W Option: Auto Write(Verify)

- Jig Option: Myson

- Transmit Speed: Medium

- Check: blank

- PORT: Select the Parallel Port to use (LPT1 in general)

*caution: Select the EPP as LPT from the ROM BIAS setting.

Copyright © 2007 LG Electronics. Inc. All right reserved.

- 20 -

LGE Internal Use Only

Only for training and service purposes

 

 

Page 20
Image 20
LG Electronics 425020, 425030 ISP Download option, Adjustment condition Download condition, How to adjust for downloading