Installation

InstallationMap

NOTICE

Installation parts you should purchase.

 

Installation Plate

 

Sleeve

 

Bushing-Sleeve

 

Putty(Gum Type Sealer)

 

Bend the pipe as closely

 

on the wall as possible,

 

but be careful that it

Air Discarge

doesn't break.

Vertical Air deflector

 

Operation Indication Lamps/

Vinyl tape(Wide)

Signal Receptor

 

• Apply after carrying out a

Forced Operation Button

drainage test.

 

• To carry out the drainage

Saddle

test, remove the air filters

and pour water into the heat

 

exchanger.

Air Inlet Vents

Gas side piping

Liquid side piping

 

Air Outlet Vents

Additional drain pipe

 

Drain Hose

 

Connecting cable

 

Base Plate

NOTE: refrigerant line wall thickness must be at least 0.8 mm (0.031 inch)

Service Manual 15

Page 15
Image 15
LG Electronics LSU120CE, LSN090CE, LSU090HE, LSU090CE, LSN180CE, LSN120HE, LSN120CE, LSN240HE Installation Map, Bushing-Sleeve