i
Table of Contents
1.0 SafetyPrecautions..................... .................... ............... 3
2.0 InstallationConsiderations... ...................... ...................... .. 4
2.1 TypesofSystemControlCabinets................... ................... 6
3.0 UnloadingandHandling.............. ...................... ............... 7
4.0 Inspections
4.1 ExternalInspections................ .................... ............. 8
4.2 InternalInspections....................... ...................... .... 8
5.0 EquipmentLocation...................................... ................. 9
6.0 BatteryInstallation................ .................... .................. 10
6.1 BatterySafetyPrecautions .......... .................... ............ 10
6.2 MatchingBatteryCabinets.. ................... .................... . 13
6.3 Non-StandardBatteries........................... .................. 13
7.0 ConfiguringYourNeutralandGroundConnections.............. .............. 14
7.1 Preferred Grounding Confi guration, Isolated PDUs, Wye-Connected Serv ice. . 15
7.2 Grounding Configuration, 480 or 600 VAC Input and Output, Delta Source. . . 16
7.3 Preferred Grounding Co nfiguration with Power-Tie Switch gear . . .. . . . .. . . . 17
7.4 GroundingConfigurations,BatterySystems.................. .......... 18
8.0 WiringConsiderations.................... .................... ............ 19
8.1 PowerWiring ........ .................. ................. .......... 20
8.2 ControlWiring ............ ................... .................... . 21
8.3 BatteryWiring .............. .................... ................. . 22
9.0 WiringConnections........... .................... .................... ... 24
10.0 WiringInspection........... .................... .................... ..... 26
11.0 InstallationDrawings .............. .................... .................. 28
12.0 AppendixA-SitePlanningData ... ................... .................... . 76
13.0 AppendixB-FieldSuppliedLugs.................... .................... ... 80