| Installation | |
5. Prepare the UPS or battery | M4 |
| |
cabinet (the “equipment”) for | Retaining | ||
screws | |||
rack mounting by following |
| latch | |
instructions in the equipment’s |
|
| |
user manual. The equipment |
|
| |
may require additional parts to |
| UPS or battery | |
be added or parts to be removed |
| ||
for rack mounting. After it is |
| cabinet | |
|
| ||
prepared, lay equipment in |
|
| |
|
| ||
inner members from Step 2 to | Front |
| |
the equipment on both sides as |
| ||
| M4 | ||
shown in the figure at right |
| ||
with (8) M4 screws provided in |
| screws | |
this kit. Make sure retaining |
|
|
latch is near the rear of the equipment (also shown in figure).
6.Open grease packet provided in this kit. Apply a 1" long bead of grease four (4) places inside the bottom, curved tracks of front members as shown at right. The grease will allow the equipment to slide into the bracket assemblies more easily.
Apply grease
UPS or battery cabinet
Apply grease (inside)
! CAUTION
Lifting equipment into rack may be a
7.Insert the equipment, with inner members attached from Step 5, into bracket assemblies by inserting top and bottom edges of inner members into the top and bottom, curved tracks of front members and sliding the equipment into rack (see figure in Step 6). Ends of inner members are tapered to allow rear of the equipment to be angled upward before insertion, if space allows.
Then the rear, bottom edges of inner
members can be placed into front edge of bottom tracks, and the front of
the equipment can be tipped up into horizontal position to insert the top edges of inner members before sliding the equipment into rack (see figure at
right). The equipment should move smoothly into bracket assem- blies. If not, recheck alignment of front and rear members from Steps 3 and 4.
11