6
FIGURE 5

STEP 5:

1/2 X 4” BOLT
(EXISTING)
TOWER
BRACE
GUIDE
RODS
TOWER
SHAFT
COLLARS

01 2 3 4 5 6

1/2 1/2 1/2 1/2 1/2 1/2
Route loop end of new CABLE (68128) (2) around pulleys
in TOWER BRACE, LOWER CROSS SUPPORT, AND
BENCH FRAME, then fasten to LEG PEDESTAL as shown
in FIGURE 6.

STEP 6:

Place TOWER BRACE over the GUIDE RODS and securely fasten TOWER BRACE to TOWER using previously removed 1/2” X 4”
BOLTS, 1/2” WASHERS, AND 1/2” NUTS as shown in FIGURE 5.
Slide the SHAFT COLLARS to the top of the GUIDE RODS and SECURELY tighten the SHAFT COLLAR SET SCREWS .
FIGURE 6
CABLE
TOWER
Reassemble SHROUD to the TOWER. SHROUD
Retighten any loosened pulley connections.