25 3/8 X | 2 |
| |
33 |
|
34 | 33 |
| 20 |
15 |
|
| 32 |
12 |
|
FIGURE 6 |
|
STEP 6:
•Insert two 2 X 3” END CAPS (34) into the TOP BOOM (2) as shown in FIGURE 6.
•Route threaded end of the LAT CABLE (15) through the TOP BOOM (2) as shown in FIGURE 6.
•SECURELY assemble two
CABLE (15) IS IN THE GROOVES OF THE PULLEYS.)
•Insert two GUIDE ROD BUSHINGS (20) into the BUSHINGS of the TOP BOOM (2) as shown in FIGURE 6.
STEP 7 |
|
|
| FIGURE 7 |
|
| |
• | LOOSELY assemble two |
|
|
| |||
|
|
|
| ||||
| LOCK NUTS (32) as shown in FIGURE 7. |
|
|
|
|
| |
|
|
|
|
|
|
| 32 |
|
|
|
|
|
|
| 12 |
|
|
|
|
|
|
| 17 |
|
|
|
|
| 24 3/8 X 2” |
| |
| 1/2 | 1/2 | 2 | 1/2 | 1/2 | 1/2 | 1/2 |
| 0 | 1 | 3 | 4 | 5 | 6 | |
|
|
|
| 7 |
|
|
|