17

16

FIGURE 11

STEP 11:

Route the threaded end of the LOW ROW CABLE (16) around the bottom PULLEY of the PULLEY & PLATE ASSEMBLY (17) as shown in FIGURE 11.

STEP 12:

 

 

FIGURE 12

 

 

 

• Screw the threaded end of the LOW ROW CABLE (16)

 

 

 

 

approximately 3/4” into the end of the post on the

 

 

 

 

WEIGHT STACK BASE (7) and tighten jam nut securely.

 

 

 

 

See FIGURE 12.

 

 

 

 

 

 

SECURELY tighten the BOLTS in the PULLEY &

 

 

 

16

 

 

 

 

PLATE ASSEMBLY (17) as shown in FIGURE 11.

 

 

 

 

 

 

 

 

 

 

POST

 

 

 

 

 

 

7

1/2

1/2

1/2

1/2

1/2

5

1/2

0

1

2

3

4

6

 

 

 

11

 

 

 

Page 11
Image 11
Life Fitness 841101 manual Step