TOP COVER

6

4

1

FIGURE 5

STEP 5

‰Place other SHROUD (1) into back of gym as shown above and securely tighten both SHROUDS (1) to TOP SHROUD BRACKET (2) and BOTTOM SHROUD BRACKET (3) using eight 3/8 WASHERS

(6) and eight 3/8 X 3/4 CAP SCREWS (4).

‰Place TOP COVER back into position and tighen with screws.

8

Page 8
Image 8
Life Fitness GS5 manual TOP Cover